01
Setting-out
Building corners, grid lines, road centrelines and pile positions set out from the approved drawings and checked independently before anything is poured.
Who we work with / Contractors
Setting-out, level transfer, control networks and as-built checks for contractors who need the same coordinates on the first day and the last.
01Where we come in
01
Building corners, grid lines, road centrelines and pile positions set out from the approved drawings and checked independently before anything is poured.
02
Benchmarks brought onto site from known control and transferred to each formation, slab or floor level.
03
A small network of protected control points, so every later setting-out uses the same reference, whoever does it.
04
Measured positions and levels compared with the design, for sign-off, payment claims or before the next trade starts.
02How we work
On a building site a survey error does not stay on paper. A column grid set out 50 millimetres wrong is found when the steel does not fit; a slab level carried up wrong is found when the doors do not. Construction surveying is mostly about making sure that never happens, and about being able to show that it did not.
We work from the approved drawings and from control that has been checked on site. Points are set out, then checked independently before anyone builds on them. Levels are carried from a benchmark and closed back onto it. Each step is written down with the coordinates, the instrument and the check, so the site has a record it can hand to the client or the engineer.
When the work is done, an as-built survey measures what was actually built and compares it with the design. That is the record for sign-off and the base for any work that follows.
What you receive
Build control
For contractors who need repeatable, verified site control.
03Services
Setting-out, grid control and level transfer for construction teams.
Turnaround1 to 3 days
Get a quoteFast coordinate capture and high-accuracy location data.
TurnaroundSame day to 1 day
Get a quoteContours, spot heights, site features and terrain data for design work.
Turnaround3 to 5 days
Get a quotePDF maps, CAD drawings and GIS-ready files.
Turnaround2 to 5 days
Get a quote04Questions
Construction surveys usually take 1 to 3 days, and RTK checks on a site we already control can often be done the same day. Tell us when the excavation or the pour is booked and we plan the visit around it.
The approved drawings in DWG or PDF, the coordinate system they are drawn in, and any control or benchmarks already on site. If the drawings and the site control disagree, we raise it before setting anything out.
A total station for building setting-out, where the tolerances are tight and walls or trees block the sky. RTK GNSS for open sites, roads, control and topography. Many jobs use both, tied to the same control.
Every set-out point is checked from a second position or against a second control point, and level runs are closed back onto a benchmark. The checks are written into the record we hand over.
Further reading
05Quote
Send the location and what you need to know. We reply within two hours on business days.