01
Before you buy a site
Slope, low ground that holds water, power line wayleaves, road reserves and the real access all change what can be built and what it costs. We map them before you commit.
Who we work with / Developers
Site appraisal and topographic surveys that show what a site allows before you commit to a price, a layout or a design team.
01Where we come in
01
Slope, low ground that holds water, power line wayleaves, road reserves and the real access all change what can be built and what it costs. We map them before you commit.
02
One topographic survey with contours, levels, trees, structures and the services at the boundary gives the architect and the engineer the same base to design on.
03
Cut and fill volumes from measured levels, for an earthworks budget or to compare contractors' bids on the same numbers.
04
Control points set and described at the start mean every later survey, setting-out and as-built lands in the same coordinates.
02How we work
The cheapest time to find a problem with a site is before it is bought, and the second cheapest is before it is designed. A topographic survey is how that happens: it records the ground as it is, so the layout, the drainage and the foundations are designed for the site rather than for a flat sheet of paper.
We measure the levels and features the design team will need: contours and spot levels, buildings and walls, trees, roads and paths, drains, poles and manholes at the boundary. Where the site is open we may fly a drone for the surface and check it with ground measurements; under trees and along structures we measure directly.
Every drawing names its coordinate system and height datum, and the control points we leave are described so they can be found again. That matters most on projects that run for a year or more, when the setting-out team needs to work in exactly the coordinates the survey used.
What you receive
Design ready
For architects, engineers, developers and planners starting design work.
03Services
Contours, spot heights, site features and terrain data for design work.
Turnaround3 to 5 days
Get a quoteFast coordinate capture and high-accuracy location data.
TurnaroundSame day to 1 day
Get a quoteDigital mapping, GIS layers and spatial analysis.
Turnaround3 to 7 days
Get a quotePDF maps, CAD drawings and GIS-ready files.
Turnaround2 to 5 days
Get a quote04Questions
It depends on the slope and on what is being designed. Building plots on gentle ground are often drawn at 0.5 m, larger or steeper sites at 1 m. We agree it with you and your designer before fieldwork, because it decides how densely we measure.
A drone covers a large open site quickly; a ground survey measures levels under trees, along drains and at the services that a drone cannot see. Many sites need a mix. The quote says which we propose and why.
Yes. We can tie the survey to existing control or a project grid, and every drawing states its coordinate system and height datum so the next consultant does not have to guess.
Topographic surveys are usually delivered in 3 to 5 days from fieldwork, depending on the size of the site. Tell us your design deadline when you ask for a quote.
Further reading
05Quote
Send the location and what you need to know. We reply within two hours on business days.